![]()
![]()
![]()
The Table is DONE! What I thought would take 2 weeks, took 4 months! Things always take longer than you think.
>Finding wood for the non-metal sections proved to be rather difficult without a car, and because I needed to have the metal sections done to double check the measurements, a big thanks goes out to my Mom, for her last minute wood purchases. Thanks mom!
>The main section of the table can be assembled with just a few simple bolts to make for easy transportation of it, or it can simply be pushed around using the 3 wheels on the back of it.
>The centre box with drawers holds recycling and has it’s own set of wheels to allow for laziness when we bring the recycling downstairs. The first time I did this, one of the people that works in the building was like ‘Wow, hmmm, that’s a really good idea..’ then he starred at it for another 2 minutes. I think he wanted one.. :)
>The whole thing cost just over $200cdn which isn’t bad considering it’s a custom design. The majorority of the cost came from the stainless steel top.
Thanks also goes out to the wonderful metal shop mallet. Remember, whenever something doesn’t fit, just hit it with a hammer.
(126) Total entries in journal
// Finland 2003
"That was when I realized. I asked myself could some of what these people be talking about actually be dangerous? And the best thing I can do is stay close to them, track what they are interested in and either hack it or try to confuse the spaces in which they operate". - Rob Van Kranenburg